From La Rochelle to Kaohsiung, a tram had more work to do after landing

The first French-built tram reached Keelung in September 2018. Before it could become part of Kaohsiung’s daily journeys, teams in Taiwan had to inspect, test and learn to maintain it.

An Alstom Citadis light rail vehicle near Kaohsiung’s Pier-2 area in March 2024.
An Alstom Citadis light rail vehicle near Kaohsiung’s Pier-2 area in March 2024.

A La Rochelle workshop, a northern Taiwanese port

La Rochelle has another connection to the sea beyond its visitor-facing harbour: trams assembled at Alstom’s local site can leave France for an overseas city. One of them reached Keelung on 2 September 2018. Its destination was Kaohsiung in southern Taiwan, but its Taiwanese journey began at the northern port and continued by land.

A Citadis carriage on a road transporter in the Metro Bureau’s historical second-tram delivery gallery. That news item concerns the second vehicle’s arrival in December 2018; this is distinct from the first vehicle’s September arrival described in the original text.
A Citadis carriage on a road transporter in the Metro Bureau’s historical second-tram delivery gallery. That news item concerns the second vehicle’s arrival in December 2018; this is distinct from the first vehicle’s September arrival described in the original text.

The order had come through China Steel in 2017 for fifteen Citadis trams for the second phase of Kaohsiung’s light rail. In the September 2018 reception announcement, Alstom, China Steel, the metro operator and city government all appear. That list helps explain why delivering a vehicle is not the same as delivering a transport service: several organisations must make it work together.

The next steps were quite practical. The newly arrived tram was to undergo coupling work, visual inspection and preparations before on-track tests. The contemporary announcement expected some second-phase passenger service in 2019. That was a forecast at the time, not a date that can be repeated as the opening actually achieved.

The last part of production happened in Taiwan

By January 2021, Alstom could report passenger service on the South Circular section, following operation of its trams on the existing first phase from early November 2020. Between the two announcements lies the difference between an arrival photograph and a vehicle carrying the public. Inspection, commissioning and training belong inside that story.

The Metro Bureau’s actual Phase 2 Citadis testing photograph, showing the low vehicle body, doors and platform. The album does not separately state this image’s shooting day. It is not presented as the January 2021 passenger-service ceremony or as a current test operation.
The Metro Bureau’s actual Phase 2 Citadis testing photograph, showing the low vehicle body, doors and platform. The album does not separately state this image’s shooting day. It is not presented as the January 2021 passenger-service ceremony or as a current test operation.

La Rochelle handled design and assembly, but the vehicle also contained work from other French sites and traction equipment from Sesto in Italy. Alstom assigned onsite testing, training and warranty service to its Taiwan-based team. The people working in Taiwan were therefore part of the process by which an international product became locally usable, rather than an audience waiting at the end of it.

The low floor and wide doors make that work readable at passenger scale. Watch the transition from platform to carriage and the space available for moving inside. The energy-storage system offers another visible clue: the trams recharge at stations, allowing the line to operate without continuous overhead wires. These are choices about how equipment occupies an existing city.

Meet the tram at Hamasen

In Kaohsiung, the C14 Hamasen stop provides a manageable place to begin. Reach it from the Orange Line’s O1 Hamasen station, then follow the signs for the light rail. Stay within the designated waiting and crossing areas. If a Citadis arrives, compare its actual platform interface with the idea of a tram that crossed the ocean; other vehicles may be assigned, so a particular model is not guaranteed.

C14 Hamasen’s planted roof and its old railway setting, from the Metro Bureau’s station-design page. This whole photograph has no CAF tram, and the roof is identified as station architecture rather than part of the French-built vehicle.
C14 Hamasen’s planted roof and its old railway setting, from the Metro Bureau’s station-design page. This whole photograph has no CAF tram, and the roof is identified as station architecture rather than part of the French-built vehicle.

La Rochelle is present here in a moving object. So are the teams who assembled it elsewhere, and the people who tested and supported it in Taiwan. Looking at a door opening beside a platform gives the overseas commission a clear ending: a technical choice is now something another person must be able to use.

The C14 Hamasen light rail stop in Kaohsiung in 2024, with its station sign, platform shelter and grass-covered tracks.
The C14 Hamasen light rail stop in Kaohsiung in 2024, with its station sign, platform shelter and grass-covered tracks.

Find this story in Taiwan

What to see
Observe tram doors, the platform interface and catenary-free operation from permitted public areas; a Citadis assignment is not guaranteed.
Visitor information
Arrive via Orange Line O1 Hamasen and follow the signed transfer to C14; the metro’s station information identifies Exit 2 for the light rail. Return through O1 to the Orange Line, or use the light rail’s opposite direction after checking the platform display.
Before visiting
The official C14 holiday page, updated 4 August 2026 and read 20 October, says listed departures are planned and actual dispatch can change. Consult the correct weekday or holiday timetable and the return connection before departing; typhoon closures and special holidays can change service.
Before visiting
Observe from the platform or designated pavement, keep doorways and accessible paths clear, and cross only at permitted crossings. No depot access is included.
Time to allow
Allow 30–45 minutes for an observation, excluding a ride; allow extra time if choosing to wait for a particular type.

Official visitor information (Chinese) → →

Film, images and visit-check dates

It begins with the original March 2024 Citadis photograph and C14 station, looks at the station’s planted roof, follows four historical delivery views and three different Phase 2 testing photographs, and returns to a genuine Citadis at Hamasen.

The normal public Metro Bureau news page records the second vehicle reaching Keelung on 10 December 2018 and the Kaohsiung depot on 13 December. Its gallery also includes images of on-track testing, so the news date is not assigned as the shooting date of every attached photograph. The film’s four delivery images visibly concern road transport, moving the vehicle and unloading rails; historical testing images are separately labelled and their exact shooting days remain unstated. The March 2020 strings in server filenames are not treated as capture dates. The first September 2018 arrival in the original story is not replaced by the second December arrival.

Only actual Citadis vehicles are used to illustrate this article’s French-built tram. Repeated exposures across the delivery and test galleries were counted only once and not repeated in the film. The selected depot workers are incidental back or side views; the vehicle is the main subject. Physical Alstom workwear and operator marks remain part of the scene.

The Tourism Administration’s Hamasen photograph has a catalogued production date of 1 January 2025; a separate shooting day is not supplied. The article’s 2024 photographs belong to a different dated record.

For a visit, use the signed public transfer from Orange Line O1 Hamasen to light-rail C14. Remain in designated waiting and crossing areas, keep doorways clear and choose the correct weekday or holiday timetable. The original official C14 page, read again for this batch on 6 November 2026, retains its 4 August update and states that dispatch can change. A Citadis assignment is not guaranteed. Depot delivery and testing photographs explain the history; they do not provide access to the depot, a workshop or a testing event.

The retained complete original article and the Metro Bureau’s normal public primary sources support the historical narrative.

Metro Bureau: second-tram delivery, 13 December 2018

Metro Bureau: actual Phase 2 Citadis testing gallery

Metro Bureau: C14 station design and place photographs

Tourism Administration: Citadis in the Hamasen railway setting

C14 official holiday timetable and dispatch notes